Aerial view of the proposed resort masterplan on the site beside Kutaisi International Airport
Development land · Imereti, Georgia · 2026

36,318 sq m at the gate of Kutaisi International Airport.

One non-agricultural title, 422 m of frontage on the state highway, the terminal 900 m away. Traffic through the airport has doubled since 2019, and a 3.6 km wide-body runway opens here in late 2026. Offered directly by the owner.

Contact the owner See the ask
Concept — Kurdiani Architects
36,318
sq m, single title
0.9 km
to the terminal
≈1.8 m
airport passengers, 2025 · est.
0.6 km
to Kopitnari rail station
The only plot of its kind at the airport.

Eight plots near the terminal are non-agricultural, over 1 ha and inside the municipality where the casino permit fee is waived. Seven belong to the airport operator, United Airports of Georgia and Georgian Railway — none of them for sale. This is the only one in private hands. Non-agricultural means it can be built on without a change of land status, and owned by a foreign investor — which agricultural land in Georgia cannot be.

See the registry check
01

The ask

USD 1.5 m · direct sale
The offer

Outright sale

Clean transfer of the full 3.63 ha title, unencumbered, with the existing masterplan work included.

Price USD 1,500,000 · USD 41.3 / sq m
Also possible

Flexible structures

A long-term registered ground lease or a purchase option with exclusivity while permitting is completed — alternative structures can be discussed directly with the owner.

Terms shaped around the buyer's needs

The price reflects what the public registry shows: the only privately-held plot of its kind within 2 km of the terminal, with 422 m of state-road frontage — see the land.

Next step Contact the owner → site visit → data room → indicative offer → exclusivity. Contact the owner
02

Why now

Three developments, Dec 2025 – Jul 2026
3.6 km

A new runway, the longest in Georgia

Under construction with modern navigation systems — a GEL 240 m state project. Due to open late 2026: Georgia’s first ICAO Code F airfield, no aircraft-type restrictions.

52 km

The Rikoti highway completed

Four lanes, 51 tunnels, 97 bridges, fully open December 2025 — cutting the Tbilisi drive to about three hours.

$4.7 bn

A record tourism year

2025 travel revenue at an all-time high on 5.5 m tourists (+8.4% y/y) — and the first international hotel brands committed to Kutaisi and Tskaltubo.

Marriott committed 120 rooms to Kutaisi and a second international brand 122 to Tskaltubo, both before the runway opened. The state is spending GEL 240 m to take the airport to wide-body traffic, and the plot at its gate is still undeveloped.

03

The land

Every figure documented in the data room
Cadastre code29.11.34.255 · public registry map
Area36,318 sq m (3.63 ha)
StatusNon-agricultural — buildable without status conversion; open to direct foreign ownership, which agricultural land in Georgia is not
MunicipalityTskaltubo Municipality (Partskhanakanevi), Imereti
ProvenancePrivatised from the state — unconditional auction purchase, 2021
OwnershipFreehold — Kurdiani family, two registered co-owners; no mortgage, lien or prohibition registered

In hand: registry extract, apostilled with certified German translation; state-privatisation purchase agreement (2021); cadastral plan. A fresh extract is issued for the data room.

Satellite view of parcel 29.11.34.255 outlined between the airport road and the railway line
The plot between the airport road and the rail line. Registry extract and dimensioned site plan in the data room.

On file from the 2019 state privatisation

United Airports of Georgia — construction cleared up to +83 m above sea level within the airfield's obstacle-limitation surface; exact heights agreed with the operator before building (letter N152, 2019).
Roads Department — no objection; the plot fronts the Kutaisi–Samtredia state road 18 m from its axis, with works in the roadside zone coordinated with the department (2019).
Georgian Railway — no objection to the disposal; structures near the line are agreed with GR (2019).
Tskaltubo City Hall — backed the privatisation as an investment and jobs project (2019).

Issued during the parcel's state privatisation; copies in the data room. Clearances for disposal and building coordination — not construction permits.

How rare this combination is

Non-agricultural status is what makes a site buildable without a change-of-status procedure — and what lets a foreign investor own it at all, which Georgian law does not permit for agricultural land. Filtering the public registry for that, at scale, beside the terminal, inside the municipality where the casino permit fee is waived, leaves one parcel.

1,277
registered parcels within 3 km of the airport
27
non-agricultural, over 1 ha, within 2 km of the terminal
8
of those in Tskaltubo — the casino-fee-waiver municipality — and not airport-operational land
7
of those 8 are owned by the airport operator, United Airports of Georgia, Georgian Railway or an on-site business — none of them land vendors
1
privately held, 3.63 ha, with 422 m of state-road frontage — this parcel

Source: National Agency of Public Registry (maps.gov.ge) — every registered parcel within 3 km of the terminal, with owner of record, retrieved 31 July 2026. Two larger non-agricultural parcels lie closer to the terminal; both sit in Samtredia municipality, outside the waiver, and neither has road frontage.

04

Location & connectivity

0.9 km
Passenger terminal, Kutaisi International (KUT)
0.6 km
Kopitnari railway station — rebuilt 2022, Stadler trains, under 5 min shuttle to the terminal
15 km
Tskaltubo balneological resort
~1 hr
Black Sea coast
~3 hrs
Tbilisi, via the completed Rikoti highway
~107 km
Anaklia deep-sea port (phase one targeted 2029)

An international airport, a mainline railway station and a four-lane state highway meet within 900 m of this plot — no other site in western Georgia has all three.

Map showing the parcel in relation to the passenger terminal, the airport road and Kopitnari station
The plot in relation to the terminal, the airport road and Kopitnari station.
05

The airport

Traffic and capital works

Annual passengers

0.87 m
1.72 m
≈1.8 m
≈1.9 m
201920242025 · est.2026 · proj.

2024: 1,722,809 passengers (airports.ge) — +97% versus 2019. 2025: ≈1.8 m — Jan–Nov came to 1.69 m (+7% y/y) and Georgia's three airports closed 2025 at a record 8.5 m combined; the official Kutaisi total is pending. Q1 2026: 386,238 (+7% y/y); 2026 projected at the current run-rate. Terminal capacity 2.5 m; roughly 23–30 nonstop destinations, 10 airlines. ACI Europe ranks KUT third among medium European airports for growth versus 2019.

What is being built

New ~3.6 km runway — the longest in Georgia, ICAO Code F, unrestricted wide-body operations; opening targeted for late 2026.
GEL 240 m total project investment; contractor Anagi.
State-owned through United Airports of Georgia — the only major Georgian airport not under foreign concession — with a declared strategy of a regional aviation and logistics hub.
First business lounge opened 2026; automated border control cuts immigration to seconds.

Today the airport takes narrow-body low-cost flights from Europe. A Code F runway lets it take Gulf carriers, Central Asian charters and freighters — longer stays, higher spend, and cargo that needs warehousing beside the apron.

Interior of the 2021 passenger terminal at Kutaisi International Airport
The 2021 terminal, 900 m from the plot — capacity 2.5 m passengers, with automated border control and the airport's first business lounge.
06

Three demand engines

National tourism at record levels

$4.7 bn
2025 travel revenue — all-time record
5.5 m tourists in 2025, +8.4% y/y · GNTA / Geostat
+23.4% EU & UK visits in H1 2026 — an all-time record, USD 335.7 m revenue · GNTA
300+ hotels announced through 2028; today's 40 branded hotels sit almost entirely in Tbilisi and Batumi · Galt & Taggart

The Imereti catchment

15 km
to Tskaltubo spa — branded hotel under construction
2 UNESCO monuments in Kutaisi — Gelati and Bagrati · UNESCO
20–30 km to Prometheus Cave and Sataplia
≤3 hrs to Racha wine country, Svaneti and the Black Sea — every one of those trips starts at this airport

Demand that isn't tourism

No. 1
Georgia's largest technology park — Kutaisi Tech Hub, opened July 2026 · Civil.ge
600 m to the Kopitnari rail siding — Middle Corridor freight and the Hualing free industrial zone nearby
~107 km to Anaklia deep-sea port — phase one targeted 2029 · Ministry of Economy
All year — airline crews night-stop here, disrupted passengers need rooms at 02:00, and the technology hub brings conference traffic; tourism peaks in August, this does not
07

Supply is arriving — but not here

Project Rooms Investment Status Developer
Courtyard by Marriott, Kutaisi120EUR 40 mOpening by 2028Rico Group
Sanatorium Tbilisi conversion, Tskaltubo122EUR 18 mUnder construction, ~2027Aka LLC
Legends Tskaltubo Spa Resort135Trading, 4-star
Airport catchment, within 2 kmNoneNo branded hotel, no scaled leisure or retail, no logistics parkThis site

Marriott is building 120 rooms in Kutaisi and an international brand is converting 122 at the former Sanatorium Tbilisi in Tskaltubo — EUR 58 m between them, committed before the new runway opens. Neither is at the airport. A hotel on this plot serves what they cannot: 05:00 departures, crews, transit passengers, groups and parking.

08

Highest and best use — four scenarios

A

Airport hotel & F&B

120–180 keys, select-service or upper-midscale brand, with meet-and-greet and long-stay parking revenue.

B

Leisure & entertainment

Aquapark and family entertainment drawing on Tskaltubo, Kutaisi and Black Sea day-trip traffic.

C

Logistics & light industrial

Warehousing, cold chain, e-commerce fulfilment and bonded storage — aimed at wide-body cargo and the rail siding 600 m away.

D

Phased mixed-use

Hotel and F&B first, land banked for phases two and three. The recommended de-risking route.

Two-page briefs

The same site written for the people who build on it — the numbers that matter to each, on one page.

Airport hotel brief · PDF Air cargo & logistics brief · PDF
≈USD 1.8 m / yr

The Tskaltubo gaming advantage

Tskaltubo is one of Georgia's designated zones where the gambling permit fee — roughly GEL 5 m (≈USD 1.8 m) a year elsewhere — is waived. It is the single largest recurring cost advantage available to this site: combined with a hotel, it supports a resort-casino product aimed at regional fly-in demand.

Treated here as optionality, not as the core case. Statutory basis: Law of Georgia on Licence and Permit Fees, art. 7(10¹) — casino permit fees are waived across Tskaltubo Municipality. Current force for 2026 should still be confirmed by a Georgian gaming lawyer, and gaming policy can change in a single parliamentary session. No scenario above depends on it.

09

The masterplan

Concept — Kurdiani Architects
Masterplan render of the proposed two hotels, casino, aquapark, retail and parkingConcept, Kurdiani Architects
Street-level render of the scheme seen from the approach road
At street level on the approach road.
Render of the gateway structure on the site boundary
The gateway structure on the site boundary.
Render of one of the two ring hotels with its interior pool court
One of the two ring hotels, pool court inside.

Two hotels, casino, aquapark, retail and parking on 3.63 ha — designed by Kurdiani Architects, the owners' own practice.

10

Risks and mitigations

Risk
Mitigation
EU trajectory and politics
Accession talks are on hold until at least end-2028 and visa-free travel for Georgian official passports was suspended in March 2026. Ordinary visa-free travel and the DCFTA remain in force — EU and UK arrivals set an all-time record in H1 2026 (+23.4% y/y) — and Asian source markets are growing fast (China +48.6%, South Korea +67.2%, Q1 2026). The asset is priced for the risk.
Single-carrier dependence
Wizz Air carries the large majority of Kutaisi traffic — ~6,800 flights and 1.8 m+ passengers in 2025. The wide-body runway opens the airport to charter, Gulf and cargo carriers, and the use mix does not rely on airline seats alone.
Seasonality
Spa, MICE, logistics and crew demand carry the shoulder months; the technology hub adds year-round non-tourist demand.
Execution
Phasing, and a brand or operator agreement signed before construction starts. The runway schedule has already slipped once — from spring to autumn 2026 — and the plan assumes late 2026, not sooner.
Currency and macro
GDP grew ~7.6% over Jan–Oct 2025, moderating toward ~4.5% in 2026; net FDI ~USD 1.7 bn in 2025. Revenue is modelled in USD or EUR terms where possible.
Offered directly by the owner

Contact the owner.

Sale, ground lease or an option to purchase — all three considered. From first call to signing: site visit → data room → indicative offer → exclusivity.

In the data room
Title — registry extract, apostilled with certified translation, and the notarised sale agreements including the 2021 state privatisation
Clearances — the five 2019 authority letters — airport height limit, roads department, railway, municipality, governorate
Land supply analysis — every registered parcel within 3 km of the terminal, with site map, parcel data and the scripts to re-run it
Concept design — the Kurdiani Architects masterplan set

An index lists what is on file and, just as plainly, what is still to be produced — zoning coefficients, utility capacities, an independent valuation and a gaming-counsel opinion among them.

Paata Kurdiani
Cadastre 29.11.34.255 · Tskaltubo Municipality, Imereti, Georgia